Current RFPs

짱구 극장판 다운로드

Fire Alarm System RFP for El Camino, La Patera, Isla Vista, and Mountain View Schools

Managed UPS / battery RFP (Feb 2020)

Wifi performance monitoring system RFP (Feb 2020)

Fire Alarm System Notice Inviting Bids – 

Fire Alarm Project RFP/RFQ LLB

Fire Alarm Project Prequalification Form

La Patera Elementary School – Fire Alarm Project Specifications (pdf)

La Patera Elementary School – Site plans/schematics (pdf)

El Camino Elementary School – Fire Alarm Project Specifications (pdf)

El Camino Elementary School – Site plans/schematics (pdf)

Mountain View Elementary School – Fire Alarm Project Specifications (pdf)

Mountain View Elementary School – Site plans/schematics (pdf)

Isla Vista Elementary School – Fire Alarm Project Specifications (pdf)

Isla Vista Elementary School – Site plans/schematics (pdf) (very large file)

 

Fire Alarm System RFP for Foothill, Kellogg and Hollister Schools

Fire Alarm System Notice Inviting Bids (docx)

Fire Alarm Project RFP/RFQ LLB (docx)

Fire Alarm Project Prequalification Form (docx)

Foothill Elementary School – Fire Alarm Project Specifications (pdf)

Foothill Elementary School –  Site plans/schematics (pdf) (very large download)

Kellogg Elementary School – Fire Alarm Project Specifications (pdf)

Kellogg Elementary School – Site plans/schematics (pdf) (very large download)

Hollister Elementary School – Fire Alarm Project Specifications (pdf)

Hollister Elementary School – Site plans/schematics (pdf)  (very large download)

Pre-bid Sign-in Sheet

Bid Opening Sig-in Sheet

 

Updated Specs and Drawings

Fire Alarm System RFP Questions and Answers

Q: Various questions regarding install

A: See attachment 1, attachment 2, General Questions , Fire Alarm Project meeting Q/A and Hollister site questions 다운로드.

 

Q:  Are there any Union requirements?

A:  There are prevailing wage law requirements on this project, as well as skilled and trained workforce requirements per Education Code section 17407.5 and Public Contract Code 2601 as set forth at the RFP, Section K(2) beginning on page 9.  See also, the related directions for Submittal Requirements at section G(6) of the RFP on page 8 의학서적 다운로드.    

 

Facilities Planning Services RFP

RFP #2019-06 Kellogg School Asphalt Rehabilitation – Main Playground and Portion of Kindergarten playground:

Bid Plans    Project Manual  Project Addendum(1)   Project Addendum (2)

RFP #2019-05 Asphalt Maintenance on main playgrounds at 8 school sites:

Bid Plans    Project Manual      Project Addendum (1)   Project Addendum (2)   Project Addendum (3)